Power Equipment Installation

Power Equipment Installation

AC power Application and Installation

p1
p2
p3
p4
p5

AC power Application and Installation              

p6

Batteries Rack

p7

Power Systems

p18

Panel with Breaker and Power meter

p8

GBT Site

p10

RTT Site

p11

Transformer Structure

p12

HT line Installation

p13

Transformer Installation

p14
p15
p16

DG Service

 


Project Description

Share this
Low Tension Installation Cable Laying , Concrete Pole, Power meter, panel with breaker and ATS connectionHigh Tension InstallationCable Laying, Concrete Pole, Transformer, LA, DS ,DOF ,Capacitor Bank ,CT meter, distribution panel with breaker and ATS connectionAC power Application and Installation AC power Application and Installation               Batteries Rack Power Systems Panel with Breaker and Power meter [...]

Project Details

Date September 21, 2017
Categories Telecom Infrastructure Service

© 2024 Kinetic Myanmar. All rights reserved. Designed by WWM